Source: https://fluotask.ru/en/help/592-how-to-set-up-a-connector
Updated: 2026-11-12

# How to set up a connector

In Fluo, you set up a connector on the workflow map: create it, pick the receiving projects, draw the links, and set the task types at the exit.

Who can use it

Connectors work on the Pro and Business plans and their trials. Anyone who can change the project's workflow can create and edit a connector. You need extended projects: only they have a workflow map.

## How to create a connector

1. Open the project that tasks will leave and go to the “Workflow” section.
2. On the panel to the left of the map, click the plug icon button (“Create connector”). The plus button “Add to the route” and its “Connector” card open the same window.
3. Enter a “Title”, for example “Bugs to development”. In “Description”, you can briefly say what the connector is for: the start of the text shows on the connector node on the map.
4. Leave “Active connector” switched on.
5. In the “Use connector in other projects of this space” block, switch on the projects where tasks will arrive.
6. Click “Create”.

The Create connector window in one column: the Title field with Bugs to development is numbered 3, the Active connector switch 4, the Use connector in other projects of this space block with the Aurora project switched on 5, and the Create button 6

The connector appears on the map. It is already on the maps of the selected projects too. The creation window has no “Task types at the exit” table: it appears in the settings of a created connector.

## What the connector window contains

To open the settings, click the “Connector settings” gear on the connector node or right-click the node. All blocks go in one column, and a long window scrolls inside. From top to bottom:

1. “Title”.
2. “Description”.
3. A short explanation of what a connector is.
4. “Active connector”. An inactive connector doesn't pass tasks: its columns disappear from the move menu, while its links stay on the map.
5. “Use connector in other projects of this space”. These are receiving projects from the home project's space.
6. “Use connector in projects of your other spaces”. You see this block if the space owner has other spaces with extended projects. Projects in it are grouped by space.
7. “Task types at the exit”. This block is only in the settings.

In the settings, project switches are saved as soon as you flip them. The title, description, “Active connector”, and the type table are saved with the “Save” button.

## How to draw the links

Each route has its own connector links, so you draw them in the route of the right type.

1. On the home project's map, select the route of the type whose tasks will go through the connector (the “Route:” button above the map).
2. Draw a link from a column's point to the point on the left of the connector. For another type, select its route and draw a link there as well.
3. Open the receiving project's map: click the badge with the number of projects in the connector's bottom-right corner and pick the project under “Recipients”.
4. Select the route of the type the task will get at the exit. If the table has no match, the task arrives with “No type”, and the link must be in the “No type” route.
5. Draw a link from the point on the right of the connector to the column where tasks should arrive.

To have tasks go through the connector by themselves, click the label of the link from the column to the connector on the home project's map, and in the “Link” panel, turn on “The task moves on by itself”. Under the switch, Fluo reminds you that the “Task types at the exit” table sets the type at the exit.

To learn how to draw links with the mouse or with clicks, see “[How to connect columns of different boards](https://fluotask.ru/en/help/587-how-to-connect-columns-of-different-boards)”. How a task then goes through a connector is covered in “[Connectors: passing tasks between projects](https://fluotask.ru/en/help/591-connectors-passing-tasks-between-projects)”.

## How to set the task types at the exit

The “Task types at the exit” table tells which type a task gets in the project it exits to. Each match takes one row: the project and type at the entrance, an arrow, the project and type at the exit, and a trash button.

1. Open the connector settings and scroll down to the “Task types at the exit” block.
2. Click “Add a match”.
3. On the left, select the project and the task type it has when it enters the connector (“Type at the entrance”).
4. To the right of the arrow, select the project the task exits to and the type it will get there. A new row has the connector's home project on the right, so you usually need to change the exit project.
5. Click “Save”.

The Connector settings window scrolled down: the Task types at the exit block with two rows (Support, Bug → Aurora, Bug and Support, Question → Aurora, No type) is numbered 1, the Add a match button 2, the Save button 5; the hint under the table is framed

Animation: in the Task types at the exit block, Add a match is clicked; in the new row, the Wish type of the Support project is selected on the left, and the Aurora project with the Improvement type on the right

The hint under the table says: “Without a match the task arrives without a type.” This is about other projects: a task whose type has no row arrives there with “No type”. If the task exits back into its own project, the one its entrance type belongs to, it keeps its type.

To reset the type in the task's own project too, add a row with that project and “No type” on the right. Such a row works only in the project selected in it.

To remove a match, click the trash button at the end of its row. The change takes effect after “Save”.

Two rows for one type with the same exit project

Only the first row works. For one entrance type and one exit project, there can be only one exit type. For another exit project, add a separate row.

A row disappeared after saving

Fluo doesn't save a row without an entrance type. A row also leaves the table if its type was deleted or its project was detached from the connector.

## How it looks on a phone

The connector window on a phone is the same, in one column. A match row folds into two parts: the entrance project and type with the trash button on top, a down arrow under them, and the exit project and type below. The buttons at the bottom of the window show only icons: the cross closes the window, the check mark saves. On a phone, the gear on the connector node is always visible, without hovering.

The connector settings window on a phone: in the Task types at the exit block, each row folds into two parts, the entrance project and type with the trash button on top, a down arrow under them, and the exit project and type below; the buttons at the bottom show a cross and a check mark

## How to change or remove a connector

The gear on the node opens the settings, and the trash button deletes the connector. The trash button is only in the home project, and deleting can't be undone. All the connector's links go with it, while tasks that have already passed through it stay in the receiving projects.

In a receiving project, there is a “Detach connector from this project” button instead of the trash button. First delete the links from the connector to this project's columns in all routes. Otherwise, Fluo replies: “Cannot detach connector: it has links to statuses in this project. Remove them first.”

The project I need isn't in the list

Only an extended project can receive tasks, not a template or an archived project. A project from another space appears in the list if that space has the same owner. To connect it, you need access to that project, and its space's plan must include connectors too.

The receiving project's columns aren't in the move menu

Check that the connector is active and that the link from the task's column to the connector is in the route of its type. Then look up in the table which type the task gets at the exit, and check that the link from the connector to the receiving column is in the route of exactly that type.

The “Create connector” button is locked

The space is on a free plan. Connectors work on Pro in a personal space and on Business in a team space. For details, see “[Workflows and plans](https://fluotask.ru/en/help/596-workflows-and-plans)”.

## Related articles

- [Connectors: passing tasks between projects](https://fluotask.ru/en/help/591-connectors-passing-tasks-between-projects)
- [How to connect columns of different boards](https://fluotask.ru/en/help/587-how-to-connect-columns-of-different-boards)
- [Task types: create, choose, change](https://fluotask.ru/en/help/590-task-types-create-choose-change)
- [The workflow map on a phone or tablet](https://fluotask.ru/en/help/975-the-workflow-map-on-a-phone-or-tablet)
- [Workflows and plans](https://fluotask.ru/en/help/596-workflows-and-plans)

## Linked from

- [Why a task isn't transferred](https://fluotask.ru/en/help/589-why-a-task-isnt-transferred.md)
- [Workflows FAQ](https://fluotask.ru/en/help/597-workflows-faq.md)
- [Workflows, routes and automations: all articles](https://fluotask.ru/en/help/695-workflows-routes-and-automations-all-articles.md)
